The construction of the Rapid Transit System (RTS) Link connecting Johor Bahru and Singapore has reached 83% completion as of July this year, says Anthony Loke.<br /><br />The Transport Minister said the construction of the RTS Link project is on track to start operations on Jan 1, 2027, as scheduled.<br /><br /><br />Read more at https://shorturl.at/SYLgw<br /><br />WATCH MORE: https://thestartv.com/c/news<br />SUBSCRIBE: https://cutt.ly/TheStar<br />LIKE: https://fb.com/TheStarOnline<br />